A long, straight roller conveyor crossing an immaculate hall at blue hour, seen from the mezzanine.

Industries/Material handling and conveyors

Conveyors priced by the metre you have actually built.

Material handling and conveyorsWhy quoting is hard

Conveyor quotes run on rules of thumb: a price per metre, a figure for each curve, an allowance for installation. Over the years those rules drift away from what lines really cost.

Drawgen rebuilds the numbers from your finished lines, so the price per metre, the transfers and the installation hours come from jobs you can open and check.

01

The price per metre is years old

It was right once. Steel, drives and hours have moved since, and nobody has had time to go back and check.

02

Transfers and curves eat the hours

Straight sections are predictable. The transfers, merges and interfaces to other equipment are where the time goes.

03

Drives and bearings are bought on habit

The same supplier as last time, at whatever price they quote, with nothing to compare it against.

An example jobJob 26-057

42 m roller conveyor with three transfers

Each line priced from what similar work actually cost on finished jobs, with its sources shown. The line no past job can support is left open for the estimator, who sets the price.

Job 26-05742 m roller conveyor with three transfersPriced lines
Straight roller sections, 36 m€06 past lines
Curves and transfers, 3€04 past jobs
Gear motors and controls€0Supplier offer, Sep 2026
Supports to existing mezzanineFor your estimatorNo past job like it
Installation, 190 h€05 past jobs, hours by role
Cost basisEvery line opens to its sources€0
Supplier requestGear motors and controlsDrafted from the record, sent to two suppliers you have usedApprove Approved by buyer

Other industriesBuilt to order

The same record, in other kinds of machine building.